How do I fill my Asgard Power Assist® Finishing Box?

To fill the Asgard Power Assist Finishing Boxes with joint compound, pull the pressure plate out to the fully open position. The pressure plate will catch in the toothed prawl and be held there. There is a latch mounted on the right side of the pressure plate that will secure the tool in the fill position. The finishing box can now be loaded with joint compound using the FA01-AD Filler Adapter and LP01-AD Loading Pump.